+------------------------------------------------------------------------------+
Questions and Answers on the NER300 programme and the first call
2010-11-09 11:10:52.550 GMT
MEMO/10/549
Brussels, 9 November 2010
Questions and Answers on the NER300 programme and the first call for proposals
1 . What is NER300?
NER300 is the world's largest funding programme to support demonstration
projects for Carbon Capture and Storage (CCS) and innovative technologies to
tap renewable energy sources (RES) . NER300 is so named because it will be
funded from the sale of 300 million emission allowances held in the New
Entrants Reserve (NER) of the EU Emissions Trading System (ETS ).
2. What is NER300's purpose?
NER300 aims to encourage private sector investors and EU Member States to
invest in commercial demonstration projects of environmentally safe capture and
geological storage of CO 2 and innovative renewable energy technologies. NER300
will establish an EU-wide demonstration programme comprising the best possible
projects using a wide range of technologies and involving all Member States.
3 . How much money will be available to support projects?
Since NER300 will be funded by the sale (or 'monetisation') of 300 million
emission allowances, the amount of money available for the demonstration
projects will depend on the price at which the allowances are sold. At the
current market price, the 300 million allowances would raise around € 4.5
billion.
4 . How many calls for proposals will there be?
The selection of projects to be co-funded will take place through two calls for
proposals. The first call, launched today, covers the equivalent of 200 million
allowances. The second call will cover the equivalent of 100 million allowances
together with any unused allowances from the first round. Having two rounds
will allow the geographical and technical balance of the projects selected to
be adjusted if necessary.
5. How many projects will be co-funded in each Member State?
Subject to suitable project proposals being put forward, at least one but no
more than three projects will be funded in each Member State. This limit
applies to CCS and renewables projects combined. Trans-boundary projects (see
point 11 below) will not be included in the limit.
All EU Member States can participate in the first call for proposals. Projects
must be located in the territories of the Member States, in their exclusive
economic zones or on their continental shelves.
6. How many projects will be co-funded?
The intention is to co-fund at least eight CCS projects and at least 34
innovative renewable energy technology projects. The actual number to be
co-funded will depend on the amount of money raised by the sale of the emission
allowances. Should there be insufficient funds to cover all 42 projects,
projects will be deleted from both groups while preserving the balance between
them.
7. What types of projects will be eligible for co-funding?
At least three of the CCS projects to be selected for co-funding must involve
carbon storage in hydrocarbon reservoirs, and at least three must store carbon
in saline aquifers. There must also be a minimum of one project, and a maximum
of three, in each of the following categories:
*
Pre-combustion;
*
Post combustion;
*
Oxy-fuel;
*
Industrial applications
Regarding renewable energy projects, the numbers of projects eligible for
co-funding in each category (which are further divided into sub-categories
representing the main technology fields within each category) are as follows:
*
Bio-energy 9
*
Concentrated solar power 5
*
Solar photovoltaic 3
*
Wind 6
*
Geothermal 4
*
Ocean (wave and tidal power, ocean thermal energy conversion) 3
*
Hydro-electric 1
*
Distributed renewables management (Smart Grids) 3
One project will be selected per sub-category.
8. Can funding from NER300 be combined with other funding mechanisms?
Yes. NER300 will fund up to 50% of the relevant costs (see questions 12 and 13)
of projects. This funding can be combined with financing from other mechanisms
such as the Structural and Cohesion Funds and the European Energy Programme for
Recovery (EEPR). Member States can also co-finance projects, but this is not a
requirement.
9. Will the funds available for project support vary between the first and
second calls for proposals?
In each round, the funds available for project support will depend on how much
is raised by the sale of the emission allowances.
10. Must each project be located in a single Member State?
No, a project can straddle national boundaries. Potential examples of
trans-boundary projects would include the following:
An array of generation units, such as solar photovoltaic cells or wind
turbines, located across a national boundary;
Transportation of CO 2 from generation plant to storage site which crosses
boundaries either via pipelines, shipping or road/rail;
Storage reservoirs extending across a national boundary.
11. Which Member State will be responsible for trans-boundary projects?
The Member State receiving the funding application will contact the other
Member State concerned to reach a common decision on whether to submit the
project. Any award decision will be addressed to the Member State submitting
the project, which will then also become responsible for implementation of the
project.
12. What level of NER300 funding is available per project?
NER300 will cover 50% of the 'relevant costs' of the project (see next
question) except where the project sponsor provides more than 50%, in which
case the NER300 contribution will be reduced accordingly.
The amount of funding available to an individual project is limited to 15% of
total NER300 funding to ensure that the programme as a whole covers all Member
States and achieves the balance of technologies required.
13. What is meant by relevant costs?
Relevant costs are the extra investment costs borne by the project (such as
investment in land, plant and equipment) to allow the application of the
technology to be demonstrated, plus the net extra operating costs from applying
the technology (i.e. the extra operating costs minus any operating benefits).
14. What is the impact of any national support schemes that are available?
Any additional benefits resulting from support schemes, such as feed-in tariffs
for renewable energy, must be taken into account when calculating the relevant
costs of the project even if they are not considered as State Aid. These
benefits will be considered in the calculation of the net operating costs and
benefits. The same is true of avoided costs, such as the avoided costs of
surrendering EU ETS allowances, and existing tax incentive measures.
15. How and when will the projects be selected?
Based on the ranking described in the next question, the highest-ranked project
in each RES sub-category will be selected. For CCS projects, the eight
highest-ranked projects will be selected provided that the criteria mentioned
at the start of point 7 above are met.
Should there be insufficient funds to cover all 42 projects (eight CCS and 34
RES), projects will be deleted from both groups while preserving the balance
between them.
Where appropriate, Member States will be asked to confirm the value and
structure of the total financing of the projects concerned, and any project for
which confirmation is not forthcoming will be replaced by the next
highest-ranked project.
The EU Climate Change Committee, made up of representatives from all 27 Member
States, will be consulted on the final project list before the European
Commission makes award decisions. The Commission aims to make these decisions
in the second half of 2012. However, any change in the timetable of other
actions on which the award decisions depend, such as the sale of the
allowances, may lead to the decisions being advanced or postponed.
16. How will projects be ranked?
Projects will be ranked in order of increasing cost-per-unit performance, i.e.
the project with the lowest cost-per-unit performance will be ranked highest.
CCS demonstration projects will be ranked as a single group. RES demonstration
projects will be ranked within each of the sub-categories.
Cost-per-unit performance is a measure of how much public funding is requested
per unit of CO 2 stored (for CCS), or of clean energy produced (in the case of
RES).
Cost is calculated as the part of the project cost that is covered by public
funding. This is not only co-funding from NER300, which is limited to 50% of
the relevant costs, but also includes funding from any other public source,
such as the EEPR or any Member State contribution.
Performance is the total projected amount of CO 2 stored in the first 10 years
of operation for CCS demonstration projects, or the total projected amount of
energy produced in the first five years of operation for RES projects.
Cost-per-unit performance is the cost divided by the performance. 1
17. How will funding be provided to projects?
Funding will be disbursed annually via the Member States based on the project
performance, ie the amount of clean energy produced (for RES projects) and the
amount of CO 2 stored (for CCS projects).
In recognition of the risks associated with such first-of-a-kind projects, only
75% of the projected performance need be achieved in order for the project to
receive all the funding under the award decision. If less than 75% performance
is achieved, the funding will be proportionally reduced.
Where the Member State guarantees that any funding not justified by performance
will be returned, part or all of the funding can be disbursed 'up-front' —
i.e. before the project enters into operation.
The Commission will determine disbursement schedules in the award decisions
consistent with the availability of funds.
18. What happens if there is no suitable project in a particular category or
sub-category?
If there is no suitable project in a particular renewables sub-category then no
award will be made for that sub-category in the first call for proposals, but
additional projects can be funded in the same category. Similarly, if there is
no suitable project in a particular CCS category then no award will be made for
that category, but additional projects can be funded in the CCS group. It is
intended that any "gaps" in coverage will be addressed in the second call
for proposals.
19. What implementation issues will be covered by the European Investment Bank?
The EIB has two broad tasks under NER300 programme:
*
performing financial and technical due diligence assessments of the proposed
projects including their ranking and making recommendations for award decisions
according to the criteria in the NER300 Decision, and
*
selling the 300 million allowances, managing the revenues and disbursing them
to Member States.
The EIB has also assisted the Commission in preparing the calls for proposals.
The Commission will prepare guidelines on how the EIB should conduct due
diligence assessments (based on the EIB's own procedures).
20. What is the procedure for applying for NER300 funding?
Project sponsors will submit their application to the Member State on whose
territory the project will be located. The Member State will assess whether the
project meets the eligibility criteria. Where this is the case and the Member
State supports the project, the Member State will submit the proposal to the
EIB and inform the Commission. On behalf of the Commission, the EIB will
perform a due diligence assessment of all proposed projects.
21. What will be covered by the due diligence assessment undertaken by the EIB?
The EIB will carry out an assessment of the financial and technical viability
of a proposed and eligible project. The due diligence assessment will cover
aspects such as the technical scope, costs, financing, implementation,
operation, environmental impact and procurement procedures. Where a positive
assessment is given, the EIB will make recommendations for award decisions to
the Commission.
22. When will the 300 million allowances be sold?
The sale of the 300 million allowances is expected to be completed before 2013
when the third trading period of the EU ETS starts.
The EIB has to start sales within a month of the allowances being made
available in a registry account. When further decisions on the sales channel(s)
to be used and other details have been taken, and before the sales start, the
EIB will publish further information. This will also cover the number of
allowances to be sold in 2011 and 2012, respectively.
23. How will the allowances be sold and what are the principles to be observed
by the EIB?
The EIB can sell the allowances through auctions, on an exchange, or 'over the
counter' (i.e. transactions with one or more counterparties). Any
auctions would have to make use of an auction platform compatible with the
forthcoming EU ETS Auctioning Regulation (for further details see:
http://ec.europa.eu/clima/policies/ets/auctioning_en.htm ).
Certain principles governing the sale of the allowances have been agreed to
ensure that the process is transparent and compatible with the smooth
functioning of the European carbon market. Most importantly, the volumes and
timing of sales will be determined with a view to minimising any impact on the
secondary market in allowances. The EIB will sell the allowances by spreading
the volumes as evenly as possible over the selling period. In addition to
publishing the main elements of the sales method on its website, the EIB will
also report on its website on a monthly basis.
24. At what price will the allowances be sold?
The EIB will sell the allowances with the objective of minimising any impact on
the European carbon market. The Bank will ensure that sale prices do not
deviate significantly from the relevant secondary market prices over the
selling period.
See also IP/10/1476
Annex: Timelines for NER 300 first call for proposals
Deadline for submission of proposals by Project Sponsors to Member States: 9
February 2011
Deadline for submission of proposals by Member States to the EIB: 9 May 2011
Estimated timing for Commission award decisions: second half 2012
1 :
As an example, for a CCS project with relevant costs of €200 million (M) and
a proposed operator contribution towards the relevant costs of €40M, the
public contribution to the relevant costs would be €160M. Of this, €100M
would come from NER300 (i.e. 50% of the relevant costs), and €60M would come
from another source (e.g. investment aid from the Member State). If, in
addition, the project receives income from a national support scheme (for
instance an existing feed-in tariff) of €30M, this should be taken into
account. Then the total cost covered by public funding would be: (200-40) + 30,
or €190M. If the project proposed to store 500,000 tonnes of CO2/year for the
first 10 years of operation, the performance would be 5 million tonnes. The
cost-per-unit performance for this project would be €190M divided by 5 Mt, or
€38 per tonne of CO 2 stored. If the operator contribution was increased to
€80M, the cost-per-unit performance would be reduced to €30 per tonne of CO
2 stored, and the project's chance of being ranked higher would improve
accordingly.
-0- Nov/09/2010 11:10 GMT